Our mission:

provision of efficient transmission of electrical energy for energy complex and Ukraine's enterprises by the construction, reconstruction and modernization of power facilities.

About company

LLC "Zaporizhia mechanized column №1" - one of the leading companies in Ukraine in the construction of transmission facilities. Since its founding in 1999, we successfully implement projects for the design, construction, installation, reconstruction, repair and modernization of the network entities. Our company is one of the few in the country which is willing to perform the task of construction of the facility from the concept to the launch.
Our company is a large modern building and mounting structure which has branches in all regions of Ukraine.
In our track record:

  • more than 500 km of constructed overhead power lines with voltage of 35 and 110 kV
  • reconstruction of power lines with voltage of 220, 330 and 750 kV
  • construction of cable lines with voltage of 0,4 and 10 kV
  • construction of cable lines with voltage of 35 and 110 kV
  • more than 50 constructed transformer substations with voltage of 35 and 110 kV
  • construction and installation work of switchgears with voltage of 220, 330, 500 and 750 kV
  • more than 100 delivered and put into operation switchgears with voltage of 0,4 and 10 kV


For realization of projects our company has all necessary resources. Our fleet offers lift trucks, mobile cranes, bulldozers, excavators, brigadier machines, trucks, rigs and tensioning machine for mounting wires and truck cables.
However, our most valuable asset - our staff. It includes more than 100 people - from senior engineers to the linesmen, behind which there is an experience of solving complex problems.


Services

1

CONSTRUCTION OF TRANSFORMER SUBSTATIONS

Leading activity of ZMC1 is engineering, installation and commissioning with construction and reconstruction of transformation substations with voltage of 0,4 to 750 kV, including usage of GIS.
In the arsenal on the company there are the most modern equipment and highly-qualified experts, which have trained in the service centers of ABB, Schneider and Eaton companies, and this has let to realize energy objects of any complexity.

Experts of ZMC1 company do all range of works of engineering of grid and energy objects, including:
  • engineering of substations and switchgears
  • construction and technological works
  • elaboration of technical-economic studies.

The company has implemented a quality management system ISO 9001:2009.

2

MODERNIZATION OF SYSTEMS OF POWER SUPPLY

Electric equipment of Ukrainian energy facilities is in exploitation for more than 35 years, over these years there has been a physical and moral deterioration.
Our company is ready to propose you the modernization of:

  • open switchgears (35kV), 110kV, 330 kV, 750 kV
  • closed switchgears (10 kV)
  • complete transformation substations (0,4 kV)
  • aggregate cabinets and equipment control systems.

3

MODERNIZATION OF DC SYSTEMS

Using big experience and latest achievements of electro technical equipment from worldwide manufacturers lets us to produce safe equipment for DC systems any complexity, including:

  • operational protection circuits of automation and telemechanics
  • remote control and alarm equipment
  • emergency lighting systems and electric power supply of especially important DC mechanisms.

We use equipment of leading European manufacturers such as Schneider Electric, Eaton (Moeller), ABB.
Adopted high-tech solutions in the engineering of the DC systems provide permanent monitoring of the system, in “on-line” mode, condition of insulation of the whole system and each connection separately, control of electrical and physical parameters of equipment work and apparatus.
Using logical apparatus in DC systems increases system in general, excepting human factor in production of planned operations and in emergency situations.

4

CONSTRUCTION OF POWER LINES

We have a big experience in the construction and reconstruction of overhead and cable lines with different voltage and optical carrier.
We use the most modern technologies in the construction, which let us to implement the reducing of the consumption of resources and cost of construction; we use both reinforced concrete and metallic pillars, glass and polymer insulation.
Engineering department of our company implements a full range of design and survey works in power lines engineering, and supervision during construction.

5

MODERNIZATION OF COMPLETE SWITCHGEARS

Our company implements the replacement of outdated, exhaust their resources, oil switches with modern vacuum switches, which were produced earlier.
Company implements:

  • elaboration of installation programs of vacuum switches with replacement of outdated equipment;
  • mass production of withdrawable elements with vacuum or gas-insulated switches;
  • reconstruction or replacement of relay protection;
  • organization and implement of installation works in modernization of complete switchgears in customer’s circs;
  • provision of requirements of safe exploitation and technical exploitation rules;
  • commissioning works.

Switches, which are used in modernization:
vacuum: ABB, Schneider Electric, Siemens, Hyndai.
gas-insulated: Schneider Electric, ABB.

02140, Kiev. М. Grishko st. 8А
+38 094 851 5007